Building Utilities

Design

  • Feasibility studies
  • Baseline measurements
  • Concept Design (preliminary design)
  • Basic Design (final design)
  • PVE / work descriptions (Program of Requirements)
  • Cost estimates

Execution

  • QC Quality control / quality control
  • Commissioning & acceptance
  • Creating test matrices
  • EHS (Environmental, Health, and Safety) execution guidance
  • Monitoring the schedule
  • Budgets
  • Projectmanagement
  • Handover support

Aftercare

  • User support during move-in
  • Providing aftercare reports for the maintenance year
  • Monitoring of the BMS (Building Management System)
  • Energy optimization advice
Concept and Basic Design and Acquires Implementation Support for Upgrade Cleanroom Facility Largest chip machine manufacturer in the Netherlands

Lees verder
Prestigious assignment for Quality Control at the Training Center of the largest chip machine manufacturer in the Netherlands

Lees verder

We remain actively involved in both the process and the aftercare phase.

The concept and basic design based on the design criteria are fully provided by us. We then guide the client through the implementation phase up to the handover. This is done using a commissioning and acceptance plan, which is prepared by us in advance.

In the aftercare phase, we remain actively involved in monitoring the installations. Naturally, we check them throughout the warranty maintenance year to ensure they continue to function according to the original specifications.

We value collaborating with our partners.

By collaborating with renowned partners, Protechnicon offers turnkey installations, from design to implementation and commissioning. This allows us to fully take care of everything for you as a client.


Cookie instellingen

Wij gebruiken cookies. Daarmee analyseren we het gebruik van de website en verbeteren we het gebruiksgemak.

Analytische cookies

Details